The cribs were removed yesterday, and the walls look good! Next week, the weeping tile and damp proofing will happen, so there may not be much in the way of dramatic visual changes for a few days.
Friday, July 25, 2008
Basement walls - ta-dah!
The cribs were removed yesterday, and the walls look good! Next week, the weeping tile and damp proofing will happen, so there may not be much in the way of dramatic visual changes for a few days.
Thursday, July 24, 2008
Concrete pouring
Here is the video of yesterday's doings! I love the motto on the boom of the concrete pump - "If we can't reach it nobody can". The fellow in the blue coveralls has the remote that controls the unfolding of the pump boom, directs it into the forms, and controls the speed of the concrete flow. A small crowd of neighbourhood kids (and adults!) gathered to watch. It took three cement trucks to come to fill the wall forms (should have taken 2 but the first truck didn't have a full load). The noise is partly the concrete pump and partly the vibrating rod that the workers are pushing down into the concrete as it pours - this makes sure it settles evenly, with no big bubbles that would create weak areas in the walls.
Wall forms
The weather has cooperated and it has been a busy week! Tuesday a cribber crew came and built the forms for the basement walls - inserting the rough bucks for the basement windows so those holes will be in place. Yesterday the concrete came - I will edit some video in the next few days and post that, too. It was pretty amazing to watch! This morning, they are taking the forms away and the walls (we hope) will stand intact!
Monday, July 21, 2008
Hole-in-the-wall
It was too wet for much to get done last week, but the weekend was dry and sunny, so today the concrete cutters came to cut the hole in to the existing basement from the excavation. I was having trouble envisioning this - what would keep the bugs and the rain out? They cut strategic slits, and then these slits were caulked. Once the basement walls are up and joists and roof and all, it will be "easy" to take a sledge hammer and knock out the bit of wall they outlined with their cuts. It was interesting to watch - but painfully noisy and dusty. Once they set everything up, the saw was operated by the guy in the boots with a remote control! The other picture is of the basement storage room, with the lights out to show the cracks of light coming in through the slits (before the caulking was done!)
Wednesday, July 16, 2008
Swimming pool
My daughter and I did joke about "While we're at it, how about an in ground pool?" But we didn't really mean it!
In these photos, you can see the chalk lines on the existing house foundation where the connection between old and new basements will be cut. But it's too wet for the concrete cutter to come. :-( The wetness you can see in the other picture - today we had several long heavy thunder storms which dumped a lot of water in the hole - hence the swimming pool! It's been too wet for the cribber to come build the forms for the walls too. We were very fortunate that the footings got poured just before all the rain began last Wednesday. Hopefully when we do get the walls poured, I may be around to get some video footage.
Those three concrete squares are the footings for the posts to support a ramp and the wheelchair accessible shower.
Friday, July 4, 2008
Forming shape
The forms for the foundation footings are now in place, so you can see the (unusual) shape of the addition. On the main floor, the area closest to the right of the picture will be the wheelchair friendly bathroom. The upper left corner area will be Timothy's new main floor bedroom, and the lower left jutting out corner area will be a main floor guest bedroom.
The first rain in two weeks is supposed to happen this evening - could be quite the mud pit some time tonight!
Tuesday, July 1, 2008
Excavation!
The hole is now the required 9 feet deep! We looked out the window yesterday and breakfast, and decided that the castle (see top photo, June 12 post) built by our summer boarder Mark Prince (you may now groan at the pun in the June 12 post...), has become a Scottish castle. You can see the foothills of some Munros to the left of the castle, and in front - that's not a moat, that's Loch Ness in a severe drought!
Speaking of drought, it has been hot and dry here for 10 days or so, and should continue for another 4 at least. Very good for digging, and could be good for pouring the foundation footings, but challenging to water the garden, which is on the other side of the Munros and the trees behind them.