Monday, July 27, 2009

Paths



It looks like not much has happened (and sometimes feels that way too), but it is STILL going on. The basement is now drywalled and painted - just some finishing things like flooring, closet inserts, window coverings, etc to go on the inside. Outside, the sidewalks have been poured, complete with "landing pad" for the wheelchair next to the driveway in the front. There are some soffits yet to be installed in the back porch over hang, then the ramp down to the side walk from the deck, and the deck railing. And landscaping. It is so nearly done, that I think that this is as frustrating as anytime- because it is so close, but not quite done!!!